Inside the factory.
Steel, panels, joinery, electrics and fit-out in one plant in Guangzhou. Everything that ships flat is built, checked and packed here.
Production hall — Guangzhou, Guangdong Frames, panels and fit-out in one sequence
01 — The plant
Five processes, one site.
JHPU is a Guangzhou manufacturer of modular container buildings. Steel-structure workshops and crane bays sit alongside roll-forming lines, sandwich-panel lamination, joinery, electrical and fit-out — so a unit is never handed between suppliers on its way to the container.
That single roof is the point. Tolerances, finishes and dates are set inside one production schedule, and every kit is inspected, labelled and packed by the team that built it. Flat-pack houses leave at fourteen units per 40'HQ; folding houses leave folded to 380 mm.
2 systems
Flat-pack and folding platforms, drawn to one set of details.
14 units
Flat-pack houses loaded into a single 40'HQ container.
3 hours
Four workers with hand tools to a finished unit. No crane.
50 lifts
Rated crane lifts per flat-pack frame over ten years.
02 — Capability
What happens under this roof.
The frame, the panel, the fit-out, the inspection and the paperwork decide whether a container building performs on site. We keep every one of them in-house.
-
01
Steel fabrication
Columns, top and bottom beams, corner posts and frames are cut, formed and welded here, then cold-galvanised and double-coated. Flat-pack connections are bolted, so nothing is welded on site.
-
02
Panel production
Wall and roof panels are laminated on our own line: 40 mm double-sided colour steel over an A2 fire-rated core, with 50–200 mm EPS, PU, rock wool or glass wool available on request.
-
03
Joinery and fit-out
Doors, glazing, wiring, sockets and lighting are installed and tested on the bench. A unit leaves finished, not as a kit to be lined out and wired by the buyer.
-
04
QC and packing
Every order is dry-assembled against the approved drawing and inspected before it is packed to the loading plan — fixings, trims and documents labelled per unit.
-
05
Export documentation
Packing list, container loading plan, English assembly manual and a video walk-through for the site crew. Documents are prepared with the shipment, not after it.
03 — The workshop
Where the kits are made.
From the steel shop to the loading yard — the sequence every order passes through before it is closed and sealed.
04 — Working with buyers
Four steps from brief to container.
One team owns the drawing, the factory slot and the booking, so the unit that arrives on site is the one that was approved.
Step 01
Enquiry
Send a layout, a sketch or a site photograph. We come back with the questions that matter: dimensions, climate, power and occupancy.
Step 02
Drawings & quote
A drawing set, a specification, an indicative price and a 40'HQ packing plan. Revisions are marked and dated.
Step 03
Production & QC
Your order goes into a factory slot, is built, dry-assembled and inspected against the approved drawing before packing.
Step 04
Shipping & support
We load, document and hand over an English manual and video walk-through. The project team stays reachable through installation.
05 — Where we are
Guangzhou, with three ways out.
JHPU is in Guangzhou, Guangdong, China, a short haul from the container terminals. Most orders load at Nansha or Shenzhen; Hong Kong is used where a consolidation suits the shipment better than a direct sailing.
The works is a working plant, not a showroom. Visits are by appointment — buyers, consultants and site crews are welcome to watch a dry assembly and walk the loading plan before their own units are packed.
Shipping at a glance
- Port of loading — Nansha, Shenzhen or Hong Kong, agreed per shipment.
- Trade terms — EXW, FOB or CIF, stated on every quotation.
- Documentation — packing list, commercial invoice, bill of lading and certificate of origin where required.
- Loading — a 40'HQ plan drawn for each order; folding units travel at 380 mm.
- On site — English assembly manual, labelled fixings and a video walk-through.
Start a project
Come and see how it is built.
Visits are arranged around production; quotations start with your layout. Either way you hear back within one business day.